Double-glazed pipeline cryogenic jacket

What is a vacuum jacket?
In the first part, the double-glazed tube is made using a MLI super-thermal insulation, with safety equipment, flow valves and flexible connections. In the second part, the insulation of this pipe and its type of coating are of great importance. In general, due to the high level of technical knowledge, special type of design, insulation, high vacuum level and temperature variation, this equipment can be considered as a small cryogenic reservoir. Vacuum sweatshirts for liquid oxygen transfer, liquid nitrogen (liquid nitrogen ) And LNG. Due to the use of this equipment in the transmission of cryogenic fluids, the temperature is very low. For example, We want to transfer the liquid nitrogen produced by the box box to the storage tank. If we use a single-walled tube or a non-standard vacuum jacket, this fluid will be heated by heat (196 ° C) and evaporates to a high degree. This makes the reservoir pressure higher, which is not desirable. The experienced pilot and experienced designer of all kinds of vacuum sweatshops has been able to offer good service to industrial and non-industrial complexes.

Vaporizers

What is a Vaporizer or Heat Exchanger?
Viprazers or heat exchangers are equipments that, without the need for electricity, water, etc., can only convert gas from gas to gas through the use of air flow, such as nitrogen, oxygen, argon and … Liquid to gas. The converter is based on the ambient temperature difference with the fluid temperature, such that the liquid passes through the tube connected to the fin and changes the liquid state to the gas. A specific type of blade design, blade length and number of blades and impeller There are a few important points to consider in choosing a vaporizer: 1) the amount of liquid inlet and the amount of gas flowing; 2) the type of fluid 3) the operating time 4) the pressure of the 5-k The lowest ambient temperature at the site of the installation of the pilot company in the sky, with the ability and experience of designing various types of brackets, is in the service of our beloved industry.

 

Repair of cryogenic reservoir

Due to the complex and double glazing of the cryogenic reservoirs, the repair of this reservoir is very specialized work. Without access to the internal reservoir and the two-wall pipes, this is far more difficult. In the repair of the reservoir should be the year of construction of the reservoir and the duration of the operation Special attention is paid to the cost of repairing cryogenic reservoirs is often higher than the actual cost of the tank. To repair the cryogenic reservoir, the following points should be considered: 1 year of construction of the tank 2 – the actual value of the tank 3 – the cost of repairs 4 – the reason for repair (Do It can be continued with this problem. 5. Fault detection in the internal or external reservoir

External tank:
Using different tests, first, it should be noted that the problem or leakage of the internal reservoir or the outer reservoir is determined. 1. If the problem is in the external reservoir, you must first specify the exact point and use the conventional methods to identify and The tests are repeated again. The result of the work is determined after filling and emptying the reservoir several times and measuring the volume of the vacuum.

Demolition of vacuum or insulation :
If the reservoir has disappeared, the reservoir must first be placed under a high vacuum to determine the leakage rate. If there is no leakage, the volume of the reservoir is monitored for a long time in both dry and liquid conditions. The charge of perlite in If the reservoir is perlite insulating, it can also be fruitful.

Internal tank :
The most difficult repair of the cryogenic reservoir is when the fault is internal to the steel tank. It is easier to work in the reservoir in which the local area is to enter. Otherwise, the external reservoir and internal reservoir must be separated, so that repairs It should be done on the internal reservoir. These repairs should be carried out in the companies with high expertise, because of this type of design of the reservoirs.

Pipes and fittings :
The failure of the pipe and fittings in the fixed and standing tanks is less likely to occur, but it is more likely to be carried out in the tanks. In this case, tests must be carried out on the reservoir to identify the defect and, using conventional methods, defect on the side To make

It should be noted that the company with the ability and experience of the construction and design of reservoirs from 1 to 220 tons has the ability to build any type of reservoir with any pressure demand. The time of construction of cryogenic tanks with a capacity less than 30 tons in about (4 months) And the duration of the cryogenic repository is more than 30 (about 6 to 8 months).

projects

 

Collection name

Shahid Tondgooyan Refinery Tehran

installation location

Iran Tehran

Installation year

1395

Type of tank

Run vacuum jacket for liquid nitrogen

Execution time

three months

Specifications

Two lines of nitrogen flow from the box box

 

Collection name

Nixa Fish Breeding

installation location

Iran-Bandar Abbas

Installation year

1397

Type of tank

Single-wall piping for liquid oxygen

Execution time

One Month

Specifications

Transferring Oxygen from the Recipe to the Place of Use

 

Collection name

Amin Hospital (Clinic Look)

installation location

Iran, Esfahan

Installation year

1395

Type of tank

Single-wall pipe for the transmission of gas oxygen

Execution time

three weeks

Specifications

Run 100 meter pipeline for oxygen transfer

 

Collection name National Iranian Drilling Company
installation location Iran-Ahvaz
Installation year 1395
Type of tank The basic repair of the tank 10 carries tons of nitrogen
Execution time Four Months
Specifications Replacing a part of the external tank
 

 

Collection name

National Iranian Drilling Company

installation location

Iran-Ahvaz

Installation year

1396

Type of tank

The basic repair of the tank 10 carries tons of nitrogen

Execution time

Five months

Specifications

Replacing a part of the internal and external reservoir

 

Collection name

National Iranian Drilling Company

installation location

Iran-Ahvaz

Installation year

1397

Type of tank

The basic repair of the tank 20 carries tons of nitrogen

Execution time

Four Months

Specifications

Replacing part of the outer and inner tank

 

Collection name

Sohail Gas Co.

installation location

Iran Tehran

Installation year

1395

Type of tank

Basic repair of tanks 20 tons

Execution time

Four months

Specifications

Replacing a part of the external tank

 

Collection name

Tenotats Taban Company

installation location

Iran Tehran

Installation year

1395

Type of tank

40 Row Verpureizer

Execution time

two months

Specifications

Build 40 rows of vertices

 

Collection name

Crystal and glass of esfahan

installation location

Iran, Esfahan

Installation year

1396

Type of tank

20 rows of verifiers

Execution time

Two Months

Specifications

To convert oxygen to gas
 

Collection name

Iraqi Super Steele

installation location

Iraq-Sulaymaniyah

Installation year

1397

Type of tank

Two 40-row spacers

Execution time

two months

Specifications

To convert oxygen to gas